OCP #1 (Charlie) CALM
Scope of Work
SOFEC designed and supplied two CALM Buoy systems for the OCP pipeline project in Ecuador. The new-build pipeline originates in the eastern jungles near Lago Agrio and covers approximately 500km to the Balao terminal, near the port city of Esmeraldas. The two buoys are located in 31m and 41m water depths approximately 7km offshore and receives heavy crude oil for export by 130,000 and 250,000 dwt tankers, respectively. Each buoy is capable of transferring up to 60,000 BPH of crude.
General Description
Client Name: | OCP/Techint |
Contract Award: | December 2001 |
Installation Date: | April 2003 |
Application: | Heavy Crude Export |
Project Specifications
Water Depth: | 31m (125ft) |
Tanker Size: | 130,000 dwt |
Dimension: | 12.5mØ x 5.3m |
Floating Hose: | 2 x 24-in. |
Underbuoy Hose: | 2 x 24-in. Chinese Lantern |
Mooring Hawser: | 16-in. Single grommet |
Anchor Leg System: | 6 x 3.1875-in. Grade 3 |
Anchor System: | 6 x 11mt drag anchors |
Design Environmental Criteria
Operational
Significant Wave Height: | 3.6m (11.8ft) |
Wind Velocity: | 21.5m/s (41.8 knots) |
Surface Current: | 1.4m/s (2.7 knots) |
Survival
Significant Wave Height: | 5.2m (17ft) |
Wind Velocity: | 30m/s (58.3 knots) |
Surface Current: | 1.6m/s (3 knots) |