NAM F3-FB Monotower
Scope of Work
This project included the design and construction of a hydraulically power driven, rotating assembly consisting of main bearing unit, fluid swivel and electrical swivel for an oil loading monotower. The SOFEC scope of work included all of the mechanical components for the main rotating drive assembly and associated swivels.
General Description
Client Name: | Nederlandse Aardolie Maatschappij BV - NAM |
Contract Award: | May 1992 |
Installation Date: | October 1993 |
Application: | Monotower |
Project Specifications
Water Depth: | 40m (131ft) |
Tanker Size: | DP Tankers |
Hose System: | 12-in. |
Swivel: | 12-in. Ø in-line |
Comments
Positioned 1.2 miles from the main complex of a concrete gravity based structure, and accommodation platform, the monotower accommodates DP tankers, which orient the loading boom via remote control.