Scope of Work
SOFEC designed and constructed an external turret mooring system to moor a 45,000 dwt MODEC-newbuild FSO located approximately 320km off the Nam Con Son Basin, Vietnam. Condensate processed at the Rong Doi Platforms will be loaded onto the FPSO via flexible riser.
![FSO Rong Doi MV12 External Turret Location Image](https://www.sofec.com/wp-content/uploads/2020/08/Side-Image_Rong-Doi-MV12.png)
General Description
Client Name: | Korean National OIl Corporation (KNOC) |
Contract Award: | May 2005 |
Installation Date: | August 2006 |
First Oil: | September 2006 |
Vessel Size: | 45,000 dwt |
Storage Capacity: | 300,000 bbls |
Water Depth: | 85m (278ft) |
Supply / Fabrication: | Turret - China Vessel - China |
Design Environmental Criteria
100-year storm
Significant Wave Height: | 8.4m (27.6ft) |
Wind Velocity: | 32m/s (62.2 knots) |
Surface Current: | 1.4m/s (2.7 knots) |
Mooring System
Turrets
8-leg Symmetric, chain, and anchor pile
External Turret
Fluid Swivel Assembly
Production: | 1 x 6-in. Inline (ANSI Class 300) |
Riser System
1 x 6-in. Flexible pipe – Production