ADMA OPCO CALM
Scope of Work
SOFEC designed, constructed, and installed a CALM terminal for crude oil exports at the Tanker Berth No. 3, Das Island, Abu Dhabi, United Arab Emirates.
General Description
Client Name: | Abu Dhabi Marine Operating Co. (ADMA/OPCO) |
Contract Award: | November 1990 |
Installation Date: | August 1991 |
Application: | Diesel, Gasoil and Naphtha Import |
Project Specifications
Water Depth: | 28m (92ft) |
Tanker Size: | 500,000 dwt |
Dimension: | 12.5mØ x 4.8m |
Floating Hose: | 2 x 20-in. |
Underbuoy Hose: | 2 x 20-in. Chinese Lantern |
Hawser System: | 21-in. Single grommet |
Anchor Leg System: | 6 x 3.75-in. Grade U3 |
Anchor System: | Unavailable |
Design Environmental Criteria
Operational
Significant Wave Height: | 4.6m (15ft) |
Wind Velocity: | 16.8m/s (32.7 knots) |
Surface Current: | 0.5m/s (0.97 knots) |
Survival
Significant Wave Height: | 10.8m (35.4ft) |
Wind Velocity: | 21.3m/s (41.4 knots) |
Surface Current: | 0.9m/s (1.7 knots) |
Comments
This single product CALM is installed in 28m water depth. The ADMA-OPCO CALM features a double hull design that eliminates potential repair problems associated with foam filled compart-ments. Six 3.75-in. chain legs anchor the 12.5m diameter CALM.
The fluid swivel incorporates an electrical swivel, which relays SCADA signals to the internal accumulator powered hydraulic valve control system that permits the PLEM valves to be remotely operated. The CALM is equipped with a load monitoring system and dual 20-in. double carcass hoses.