FPSO HYSY113 Tower Yoke
Scope of Work
SOFEC designed and procured a tower yoke mooring system for the HYSY113 FPSO.
The FPSO, named HYSY113, is deployed in the BZ25-1/S field approximately 150 kilometers southeast of the Port of Tanggu in Bohai Bay and is a replacement for a previously operating mooring system.
The tower yoke mooring system is an interface between the BZ25-1/S wells and the FPSO and will provide for the transfer of well fluids, water injection and provide Medium Voltage power to the well head platforms.
Storage Capacity: Water Depth:
800,000 bbls 18m (59ft)
General Description
Client Name: | CNOOC Energy Technology & Services Ltd. |
Contract Award: | July 2011 |
Installation Date: | January 2013 |
First Oil: | February 2013 |
Vessel Size: | 110,000 dwt |
Storage Capacity: | 800,000 bbls |
Water Depth: | 18m (59ft) |
Design Environmental Criteria
100-year storm
Sig. Wave Height: | 5.4m (15ft) |
Wind Velocity: | 28.3m/s (55 kts) |
Current: | 1.85m/s (3.6 kts) |
Fluid Swivel Assembly
Production | 2 x 16 in. Toroid |
Production/ Water Injection | 1 x 16 in. Toroid |
Water Injection | 1 x 16 in. Toroid |
Gas Import | 1 x 10 in. Toroid |
Slip Rings
Medium Voltage: 3 x 3 phase 10.5 kV
Utility/Control: 80 paths/200 paths
Riser System
7 Risers – Production and Water Injection
3 Umbilicals for medium voltage electrical and controls
Comments
This is the second tower yoke mooring system which SOFEC is operating in Bohai Bay, China. This SOFEC tower yoke mooring system is be DNV classed.