PFLNG 2 DUA External Turret
Scope of Work
SOFEC designed, constructed, fabricated and delivered an external mooring system complete with anchor chains and anchor piles.
The SOFEC external mooring system is DNV classed.
General Description
Client Name: | Petronas FLNG-2 |
Contract Award: | December 2012 |
Installation Date: | Planned for 2020 |
First Oil: | Planned for 2020 |
Vessel Size: | 1.2 MTPA LNG |
Process Capacity: | 230 MMSCFD |
Water Depth: | 500-1500m (1,640-4,921 ft) |
Fabrication: | Turret - China Topsides - DSME - S. Korea Vessel - DSME - S. Korea |
Design Environmental Criteria
100-year storm
Sig. Wave Height: | 5m (16.4 ft) |
Wind Velocity: | 24.1m/s (46.85 kts) |
Current: | .82m/s (1.59 kts) |
Fluid Swivel Assembly
4 – Toroid Swivels with medium voltage swivel, low voltage and signal swivel and fiber optic swivel
Riser System
4 -10 in. flexible risers
3 – Umbilicals