FPSO Carioca MV30 Spread Mooring
Scope of Work
SOFEC is responsible for the design and procurement of a spread mooring system for the FPSO Carioca – MV30 which will be deployed at the Sépia Field in Santos Basin, offshore Brazil.
The FPSO will be capable of processing 180,000 barrels of crude oil per day, 212 million standard cubic feet of gas per day, 240,000 barrels of water injection per day and has a storage capacity of 1,400,000 barrels of crude oil.
The FPSO will be able to accommodate a total of 51 flexible risers and umbilicals. The FPSO is also able to accommodate 21 steel risers instead of the 21 flexible pipes serving the production / gas injection wells.
The SOFEC spread mooring system will be ABS classed.
General Description
Client Name: | Petróleo Brasileiro S.A. (Petrobras) |
Contract Award: | October 2017 |
Installation Date: | Planned for Q2 2020 |
First Oil: | Planned for Q2 2020 |
Vessel Size: | 282,000 mt |
Storage Capacity: | 1,400,000 bbls |
Water Depth: | 2,140m (7,021ft) |
Design Environmental Criteria
100-year storm
Sig. Wave Height: | 11.6 m (38.06 ft) |
Wind Velocity: | 34.51 m/s (67.08 kts) |
Current: | 1.67 m/s (3.25 kts) |
Riser System
8 Oil Production Risers
3 Oil Production / Water Injection Risers
11 Gas lift / Service Risers
10 Water / Gas Injection Risers
1 Gas Import / Export Riser
16 Control Umbilical
1 SESDV Control Umbilical
1 Fiber Optic Cable